City of Buffalo Preservation Board·July 23, 2026
The board approved the full renovation of the Broadway Market: a near-reconstruction of the 1955 Broadway elevation, whose brick was stripped off in 1981, and the failing rear parking deck traded for a plaza and green space. It also recommended landmark status for the fireboat Edward M. Cotter and saved a pair of 25-inch front doors on Pennsylvania Street.
The presentation the board had been waiting for came in the last half hour of its last meeting before the recess, and it came with a figure attached: $45 million. The Broadway Market at 981 Broadway — the East Side's surviving Polish market hall, and the building the city checks on every Easter — is getting a complete renovation, and the project's presenter opened by saying it had taken six years of work with the City and others to reach a board table. “We are very proud to be here today.”
The structural case is grim and simple. The second-floor columns are “in really difficult shape” and all of them are being replaced, which means the first floor has to be shored while the work happens, which means the phasing has to keep the vendors trading throughout. That is the hard part of the job, and the team said it has spent two years with consultants working it out. The sequence: move every vendor to one side of the hall, renovate the other, then move them into permanent homes, consolidating a thinly spread floor into a denser arrangement with a food court at the front and a central aisle running back. Construction runs about two years, deliberately scheduled, as the presenter put it, “Easter to Easter” — because the market's one enormous week has to be protected, and because the plan has to leave a flex space big enough to absorb the Easter overflow.
The preservation substance is the front wall. The market was built in 1955 as a one-story building with parking on the roof; a second deck came later, giving two levels of parking, and the team's inspiration photograph is from 1956 — a streamlined modern building with glass that let you see into the hall, and parking at five cents. The brick that articulated the Broadway elevation was removed in 1981. “The brick doesn't exist,” the presenter said. “There was no brick.” What went on instead, at a moment when there was no budget for anything else, was a brick-patterned spatter coating — better than what it covered, nobody's idea of right. So the Broadway front is now “almost a reconstruction”: the existing storefront and planters come off entirely, the wall is restored to its 1955 configuration with a couple of door locations shifted, and two brick types go back on, one matched exactly to the surviving condition, with the grout matched to the original red. The upper two levels of concrete get painted — a chocolate tone on the upper columns. Signage is deferred: ideas are with the National Park Service and whatever it approves will determine what goes on the building.
Behind the building the changes are larger. The rear parking deck has deteriorated past repair and is coming out, replaced by a new solid wall with precast panels matching the concrete banding and a darker brick at the lower band, a new surface parking lot, a public plaza for tents and festivities, and open green space for farmers' markets and events. A four-bay loading dock goes in where the deck was — the first real dock the building has had. Vendors who sell across the city have been backing semi-trailers down South Market Street and into the market itself to load. The rear wall is designed to open: doors that fold back in summer to make the plaza an extension of the hall. The M&T branch inside, which the presenter called a very active office, stays open through a four-phase construction sequence designed around it.
The board's questions were the board's questions. One member pressed on the curtain wall versus storefront system and the mullion stock, and got a hybrid answer: curtain wall where the angles demand it, dimensions pushed as narrow as two and a quarter or two and a half inches. The same member then made the afternoon's one real design argument — there was a horizontal member in the original elevation, a small aluminum transom bar visible in the 1956 photograph and in the original construction drawings the team had supplied to staff, and the design has resisted putting one back. The answer was that the glass is running base to head for daylight; the member's counter was that a transom of the original dimension costs very little light and reinforces the horizontality of a horizontal building. “I could be swayed either way,” the presenter said. Another member raised something no rendering covers: at the entrance by the meat markets there is a wheelchair ramp leading to a locked door into the commercial kitchen. “The ramp is not functional.” The doors there are being replaced; the board asked for signage so no one else is sent up a ramp to a door that does not open to them.
Preservation Buffalo Niagara's executive director filed written comment, read into the record by a PBN staffer. It commended the team for responding to earlier feedback — the switch from a darker black brick to a lighter “sandy blonde” is “a significant improvement,” warmer masonry being more compatible with the building's mid-century modern character and likely to age better — and made one recommendation: rather than leaving the ground beyond the new parking lot as empty lawn, gravel it and run electrical infrastructure for lighting and vendor power, so it can hold community events, seasonal programming and, eventually, an outdoor farmers' market that would echo the open-air function the market began as. The team said new light poles and power are going into the rear already; plugs can be added. The board approved the certificate, with the presenter agreeing to come back on the restoration details and the signage.
On the money: the federal rehabilitation tax credit is in hand at the stage that matters. The project's Part 2 application was approved by the National Park Service “with no” conditions, the presenter said, crediting the consultant who wrote it; the capital stack is the State's regional revitalization program with Empire State Development managing the money, plus the historic credit and New Markets credits. The market planner on the team, the presenter said, has been doing significant markets around the country for forty years.
Board: the presiding member, heard as Gwen Howard[*], with Catherine Schweitzer[*], Damante' Curry, Don Gilbert, Kevin Brady, Eric Lander and Ruth Bryant all audible moving or seconding motions. Anthony James was called excused. Sam Gurney's status is not recoverable from the roll.
Staff: present. The board's planner, Chris Hawley, called the roll, ran the presentation screen and held the applicants' documents — a contrast worth noting against the board's September 3 meeting, where no staff were in the room and the board said so repeatedly.
Applicants heard: an architect for a garage rebuild; Shannon Murphy[*] of Solar Solutions[*] for a rooftop array; a co-owner heard as Natalie[*] with Sylvester Architects[*] for 361 Pennsylvania Street; an engineer heard as Mr. Bracco[*] for 166 Hughes Avenue; a homeowner on an upper-porch railing; the Broadway Market development team; a demolition applicant at Bailey and Kensington; and Preservation Buffalo Niagara on two landmark applications.
Public comment: one written statement, from PBN's executive director, on the Broadway Market. No speakers at the public hearing.
The federal historic rehabilitation tax credit is worth 20 percent of qualified rehabilitation spending on an income-producing certified historic structure, and New York layers a state credit on top. It is awarded in three steps, all administered by the National Park Service through the State Historic Preservation Office. Part 1 certifies that the building is historic. Part 2 — the step the Broadway Market team announced on Thursday — is the Park Service's review of the proposed work, measured against the Secretary of the Interior's Standards for Rehabilitation. An approval with no conditions is the whole ballgame for a project this size: it means the design as drawn will not cost the owner the credit. Part 3 certifies the completed work. Because that review turns on the Standards rather than on City code, it is also the discipline that binds hardest on a project like this — which is why “what the Park Service approves will determine the sign” was an answer the board accepted.
The public hearing was held last, after the presiding member twice deferred it for an applicant who never came. “Last shall be first,” she said, and opened the hearing on a proposal to designate the fireboat Edward M. Cotter, at 13 Buffalo River, as a City of Buffalo local landmark. The notice ran in the Buffalo News on July 8.
The applicant is a council member, who was held up on a state-authority matter in his own district; the staffer working on the application was out. So there was no one to present, and the presiding member read the case off the application herself. Four criteria were cited: criterion 1, character, interest or value as part of the community's heritage; criterion 3, exemplifying the city's historic and — in this case — cultural heritage; criterion 8, elements of architectural, engineering, design, detail, material and craftsmanship; and criterion 9, a unique location or singular physical characteristics making it an established and familiar visual feature.
The boat is already a National Historic Landmark — and, the presiding member said, she believes the first and possibly the only floating one. “So this is really just catching local designation up to national designation.” She made the case on the record anyway: the Cotter fought fires along the grain elevators and the industrial waterfront, is still in service, and has worked across the river in Canada. She called it “an excellent representation” of a city that cares about its northern neighbors. A member who spoke in favor put it more briefly: “How could you not?” — the oldest active fireboat, meeting nearly every criterion, and going for local designation despite already holding the national one.
Nobody spoke against it, in the room or online — by then, the presiding member noted, there was no one left in the room at all. The hearing was closed and the recommendation to the Common Council carried, moved by Kevin Brady and seconded by Don Gilbert. Council Member Nowakowski, the presiding member said, would pass word to the applicant council member. One exchange immediately before the vote — a brief back-and-forth about whether a member needed to recuse — is not clearly captured on the tape and is reported here only as unresolved; no recusal was recorded.
In Buffalo, yes. The City Code's designation criteria in Chapter 337 attach to a property or structure, and the Cotter is carried at a street address — which is how a vessel that leaves its berth to fight fires ends up in the same regulatory category as a house. The practical consequence of local designation is the same as for any landmark: exterior alterations would need the board's certificate of appropriateness. The federal status it already holds — National Historic Landmark, the rarest tier of the National Register, reserved for nationally significant properties — carries prestige and grant eligibility but no veto over what an owner does. That asymmetry is the reason the presiding member described the application as catching the local record up to the national one rather than as adding recognition.
361 Pennsylvania Street — the long one. A co-owner heard as Natalie[*], with Sylvester Architects[*], brought a full exterior rehabilitation: fiber-cement siding (James Hardie smooth lap, over a weather-barrier assembly, with hot-dipped galvanized fasteners and Sherwin-Williams paint), replacement of the front door, replacement of all windows except a stained-glass window the board eventually established is in the main stairwell, a new aluminum porch railing, fiberglass-wrapped porch columns, a new rear exterior stair with aluminum railing, and porch-deck repairs. The chimney — “gorgeous, but you can see it's just barely hanging on” — is to be refinished and repointed, and the board specified a lime-rich mortar slightly more sacrificial than the brick. The owners want the house back as a “painted lady” in colors they took from the real-estate listing photographs, which produced the afternoon's driest exchange: “How do you know they're the original paint colors if they're not on it currently?”
Two things the board would not let pass. First, the columns: the drawings showed one thing and the renderings another, and a member cut through it — the renderings are not accurate, the elevations govern, and the approval is for what the elevations show, not “some kind of fiberglass wrap that coordinates with your custom millwork consultant.” Second, and the item's real outcome: the front door. The existing entry is a pair of 25-inch leaves; the proposal replaced them with a single 36-inch door and a 12-inch sidelight, the opening being too narrow for sidelights on both sides. A member objected that a sidelight on one side alone throws off the symmetry of a Second Empire entry, that the board had given somebody else “a really hard time” for removing one a street away, and that he preferred the doors as they are. “I would recommend restoring that door then.” The applicants took the recommendation on the spot, and the certificate was approved with that modification. Permastone at the first-floor porch comes off as proposed.
166 Hughes Avenue. An engineer appearing as Mr. Bracco[*] was candid about how he got there: a contractor had a job to restore a porch, his office designed the LVL beam and connections as a structural repair, and only afterwards did he find out the house is in a historic district. Three new 6-by-6 treated columns, wrapped, replacing square columns that had deteriorated away; the existing wall, concrete stairs and railing all stay. The board's only ask was proportion — wrap them thicker, and add a capital at the top. “Of course,” he said. Approved with that modification.
196 Hughes Avenue. Shannon Murphy[*] of Solar Solutions[*] presented a 35-panel rooftop array, all-black glass on black rails to sit with the existing roof, using both roof planes except the first six feet on the left, with a Tesla Powerwall mounted at the rear beside the meter. Code requires the panels on opposing planes, which is why some sit at the roof's edge. The quickest approval of the day. “We'll see these more and more, and they are reversible,” a member said. Asked how she was voting: “I'm a yes.” — “You love solar.” — “I do.”
A garage, enlarged. The first item of the afternoon was a demolish-and-rebuild of a rear garage, single storey with a hip roof, already cut down substantially from what the owners first wanted, with a garage door and an operable window serving a workshop with a bathroom inside. The board's objection was character: a counter-height operable window reads as a commercial service window, and a member said so without ornament — carry the panel detail from the overhead door across underneath it so the building looks like a building, “not like an ice cream stand.” Approved on a revised drawing showing that change. The address is not recoverable from this recording and is not asserted here.
The railing nobody could finish. A homeowner came back on an already-conditioned approval for an upper-storey wood porch railing, with an unanswerable reason: the contractor who was to return to correct it had died unexpectedly, and nobody else wants to touch another contractor's half-finished work. His point was contextual — walk the block and only two houses have wood upper-porch railings, his and the one to the left, and his existing railing matches the neighbour's; everyone else has wrought iron or nothing. The board had originally required the balusters to sit between the top and bottom rails rather than face-nailed on the outside. The solution worked out across the table was carpentry, not principle: add a piece of wood in front at the top and bottom so the overlap does not read, cut off the protruding ends, and run a cap across the whole thing. “And call it a day.” Approved with the suggested modifications. The address, heard only as a number, is not asserted here.
Every applicant brings two kinds of drawing, and the board treats them very differently. Renderings are persuasion: they show the building as the owner hopes it will feel. Elevations are measured, dimensioned, scaled statements of what will actually be built. A certificate of appropriateness attaches to the specific documents in front of the board, so when the two disagree — as they did at 361 Pennsylvania Street, where the renderings showed one column treatment and the elevations another — the board has to say which one it is approving, or it has approved nothing enforceable. “We're going to go with the elevation and not the renderings” is not pedantry. It is the difference between a condition and a hope.
Section 106. Before any application was heard, the board spent several minutes on something that does not touch a single Buffalo property directly and could touch all of them. A member had handed out material on a proposed change in federal law that would, as she described it, significantly diminish the review requirements of Section 106 of the National Historic Preservation Act — the step that forces a federal agency to consider the effect of a federally funded or permitted project on historic properties. She pointed the room at the National Trust's advocacy alert at savingplaces.org and asked everyone to contact their representative. “It is a change in the process of federal oversight of historic projects.”
Shoreline Apartments, 99 Carolina Street. The State Historic Preservation Office gave notice that it will consider a nomination of the Shoreline Apartments for listing on the State and National Registers — a communication only, with no action for the board.
1823 and 1833 Clinton Street. A completeness review, not a hearing, on an application to designate the St. Casimir Social Center and School a local landmark. Preservation Buffalo Niagara brought it on behalf of very new owners who, the presenter said, want to pursue the tax credits and are also going for a determination of eligibility and full National Register listing. Photographs of every side, a map, criteria, and an abundance of newspaper articles — one of them in Polish, which the presenter had read by pointing Google Translate's camera at it. Found complete; the public hearing set for September 3. (It was held that day, and the board recommended designation.) The presiding member reminded her to contact the district council member, since this is an owner-partnered application.
1119 Broadway. A second local landmark application, submitted by Preservation Buffalo Niagara on behalf of the board's own local landmark subcommittee. Photographs on all sides, criteria, a plan, a map — and, the board noted, “a lot” more untranslated Polish articles. “Your Polish is just going to be great.” — “Oh, I'm going to do it. Watch me.” Found complete.
Bailey and Kensington. An advisory demolition of a single-family house at the corner, presented for a food shop in the adjoining one-storey strip that owns the whole development and wants the lot for cold and dry storage. A replacement building of about the same size would be connected to the market. Asked whether the house meets any of the designation criteria, the room's answer was not audible as a yes. Received and filed — the only action available, since the board's binding demolition review reaches local landmarks and local historic districts, and advisory cases end with a recorded view and no power behind it.
Carry-overs. 664 Fillmore Avenue, still working through its issues — the board could not quite make out the e-mail that had come in. The North Pearl Street window job, back again without the information the board needed and held to next time; it was approved at the September 3 meeting. An item on North Street, under review. And no movement on the proposed Hospital Hill historic district.
Section 106 is not a protection. It is a procedure: when a project uses federal money, needs a federal permit, or sits on federal land, the agency involved must identify historic properties in the way, assess the effect, and consult — with the State Historic Preservation Office, with the Advisory Council on Historic Preservation, with local governments and affected communities — before it acts. The consultation ends not in a veto but in a negotiated agreement, usually a Letter of Resolution setting out mitigation: documentation, salvage, an interpretive display. Buffalo's record is full of outcomes that exist only because that conversation was mandatory. Weaken the trigger and the conversation stops happening — which is why a board with no federal role at all spent its opening minutes on a bill.
A determination of completeness is the smallest vote the board takes, and the easiest to mistake for a win. It asks one question: does this application contain enough — the designation criteria, photographs of every elevation, a site plan, a documented history — for the board to hold a public hearing on it? Nothing about merit is decided. Both Thursday's completeness votes simply moved applications onto a hearing calendar, where the substantive recommendation gets made and then goes to the Common Council, which is the body that designates.
Built from the tape alone. The City's structured agenda, recorded-vote file and summary minutes for this meeting were not available when this brief was compiled (see Editor's Note), so item numbers are this brief's sequence rather than the City's, and movers and seconders are as heard and incomplete. Every vote was a voice vote — “all in favor, anyone opposed” — with no opposition audible on any of them; no counts were announced and none are stated here. Timecodes are recording positions, not clock times.
First item after the roll. “All in favor. Anyone opposed? Motion carries.” No count announced.
A member distributed National Trust advocacy material on the Section 106 proposal and urged the board to contact their representatives. No motion on either item.
Second by Catherine. Condition stated in the motion: a revised drawing treating the area beneath the operable window with panels matching the overhead door opening, so the elevation reads as a carriage door rather than a service window. Garage door and operable window to a conditioned workshop with a bathroom; windows not visible from the street, the overhead door is. The address is not recoverable from the recording and no agenda was available.
Second by Catherine. 35 all-black panels on both roof planes, excluding the first six feet on the left; placement on opposing planes is a code requirement. Tesla Powerwall mounted at the rear adjacent to the meter. Permit to be released on the board's e-mail the following day.
Approved on the modification that the existing pair of 25-inch door leaves be restored rather than replaced with a single 36-inch door and a one-sided 12-inch sidelight, the board holding that an asymmetrical sidelight disfigures a Second Empire entry. The elevations, not the renderings, govern the column treatment. Chimney to be repointed in a lime-rich mortar slightly more sacrificial than the brick. Permastone at the first-floor porch removed as proposed; rear door assembly replicated in kind with insulated glass. Flagged for the condition that changed the project. Address corrected from “Pennsylvania Avenue” on the tape — see the Editor's Note.
Moved by Kevin Brady, second by Eric Lander. Modification: wrap the columns to a greater dimension and add a capital at the top, matching the proportions of the deteriorated originals. Existing wall, concrete stairs and railing retained.
Brought back because the contractor who was to perform the conditioned correction died unexpectedly and no replacement would take over the work. Resolution: apply a facing piece of wood at the top and bottom rails so the face-nailed balusters do not read, cut off the protruding ends, and run a cap across. The applicant noted that only two houses on the block retain wood upper-porch railings and that his matches the adjoining one. The address is heard only as a number and is not asserted here.
A $45 million project, six years in development, with the federal rehabilitation tax credit's Part 2 application approved by the National Park Service without conditions; funding from the State's regional revitalization program (administered by Empire State Development), the historic credit and New Markets credits. All second-floor columns replaced with the first floor shored; vendors moved side to side and kept trading; roughly two years of construction phased Easter to Easter with a flex space held for the Easter overflow. Two brick types on the Broadway front, one matched exactly to the surviving condition with grout matched to the original red; upper concrete decks painted. Signage deferred pending National Park Service review. Written public comment from Preservation Buffalo Niagara's executive director commended the change from a dark brick to a lighter “sandy blonde” and asked for gravel and electrical infrastructure in the rear lawn for events and a future outdoor farmers' market. Board requests on the record: reconsider restoring the original horizontal transom member in the storefront; add signage at the locked kitchen door served by a wheelchair ramp; return with restoration details. Flagged as the meeting's principal action.
664 Fillmore: the owner is continuing to work through the issues. North Pearl: the information the board needed was not supplied, held to the next meeting (approved September 3). No movement on Hospital Hill. No motions.
Second by Catherine. Advisory only; the permit decision rests with Permit and Inspection Services. The applicant owns the adjoining one-storey strip and would build a replacement of about the same size, connected to the market. Flagged as a demolition the board recorded a view on without the power to stop. No street number is stated on the tape and none is asserted here.
Owner-partnered application brought by Preservation Buffalo Niagara; the owners are also pursuing a determination of eligibility and full National Register listing. Photographs of all elevations, a map, criteria and newspaper documentation, including a Polish-language article translated with a phone camera. The hearing was held September 3, 2026, where the board recommended designation.
Second by Ruth Bryant. Submitted by Preservation Buffalo Niagara on behalf of the board's local landmark subcommittee; criteria, plan, map and photographs on all sides, with a substantial file of untranslated Polish-language articles.
Moved by Kevin Brady, second by Ruth Bryant. Notice published in the Buffalo News July 8. The applicant council member and his staffer were both absent, so no one presented; the presiding member read the application's criteria into the record. One speaker in favor, none against, in the room or online.
Moved by Kevin Brady, second by Don Gilbert. Already a National Historic Landmark, and described by the presiding member as the first and possibly only floating one; the oldest active fireboat, still in service, with a record of firefighting on the Canadian side. Council Member Nowakowski to inform the applicant council member. A brief exchange about whether a member needed to recuse is not clearly captured on the tape; no recusal was recorded. Flagged as a completed substantive recommendation.
Moved to adjourn into the August recess; second by Eric Lander.
What this brief was built from, and what is missing. This brief is built from the City's own Webex cloud recording of the meeting, produced under a Freedom of Information Law request, and from nothing else. The Preservation Board's recordings are not posted on the City's CivicClerk meeting portal, where every other body's video appears within a day or two, and the board's agenda, structured agenda-item file with recorded votes, and summary minutes for July 23 were not available when this brief was compiled — the portal's automated collection window covers recent meetings only, and the July material had aged out of it. The City's vote record is normally this publication's ground truth for item numbers, official entity names, addresses, movers, seconders and roll calls; without it, every proper noun and every street number in this brief rests on a single room microphone. Item numbers in the All Motions table are this brief's own sequence. Five items are therefore reported without an address — the rear garage, the porch railing, and the Bailey-and-Kensington house's street number among them — rather than with a guessed one. The board's regular slot is 3 p.m.; the tape does not state the start time or the room, and neither is asserted here. The recording opens about seven minutes before the call to order.
One address corrected, on the street check. The presiding member read the big residential item as “361 Pennsylvania Avenue.” The City of Buffalo street index carries Pennsylvania Street and no Pennsylvania Avenue, and street_check.py returned the correction at full confidence; it has been applied throughout, and the brief reports the item as 361 Pennsylvania Street. No agenda was available to confirm it independently. This was the only street-name change in the brief.
Anomalies left standing rather than papered over. (1) The roll. Anthony James is clearly called excused; the rest of the roll is partly unintelligible, and Sam Gurney's status cannot be read off it. Seven members are audible moving or seconding motions during the meeting. (2) A recusal question that went nowhere. Immediately before the Cotter vote someone says a member need not recuse himself; the surrounding words are lost, and no recusal was recorded. It is reported as unresolved and nothing is inferred from it. (3) A presiding-member discrepancy with a later record. This publication's September 3 brief reports that, on that date, the presiding member abstained from approving these July 23 minutes on the ground that she had not been present. The July 23 tape has a presiding member running the entire meeting, addressed by an applicant as Gwen. The two cannot both be right. Neither the July nor the September minutes were available to resolve it, and the discrepancy is flagged here rather than silently corrected in either direction. (4) No vote counts. Nothing in this packet establishes a tally for any motion; every outcome is reported as a carried voice vote with no opposition heard.
Corrections applied. The town corrections file was applied in full. Board members' names follow the roster verified from the City's September 2026 roll calls: Gwen Howard, Don Gilbert, Damante' Curry (heard “the Monte Curry”), Anthony James (“Tony James”), Eric Lander, Ruth Bryant, Kevin Brady, Catherine Schweitzer. The board's chair is not verified in any official source available to this publication, so the member who runs the meeting is called “the presiding member” throughout. Proper nouns normalized conventionally: Edward M. Cotter (heard “Everton-Cowder,” “the Connor,” “the car”), St. Casimir, Nowakowski, Kensington, Bailey, Fillmore (“bill more”), SHPO, James Hardie (“James Hardy”), Sherwin-Williams (“Sherman Williams”), Permastone, Section 106, savingplaces.org. The street check found one candidate reference, corrected as described above.
Names this brief could not verify. With no agenda in the packet, every applicant name and entity comes from audio alone and carries [*]: the 361 Pennsylvania co-owner (Natalie) and her architects (Sylvester Architects, with Christina and David); the solar installer (Shannon Murphy, Solar Solutions); the engineer at 166 Hughes (Mr. Bracco); and the Broadway Market's presenter, whose surname is not recoverable — he is referred to by role, and the consultant credited with the Part 2 application (heard as Carrie Trainer[*]) likewise. Preservation Buffalo Niagara's executive director, whose written comment is quoted, is not named on the tape and is not named here; the staffer who read it is the organization's planner. The applicant council member behind the Cotter nomination is not identified on the tape and is not named. Chris Hawley, the board's staff planner, is named from the City's own correspondence rather than from the tape.
Other checks. The interests watchlist was checked against every address, applicant and entity heard on the docket; no match. The scanner entity database was queried read-only for each docket address — 981 Broadway, 1119 Broadway, 1823 and 1833 Clinton Street, 361 Pennsylvania Street, 166 and 196 Hughes Avenue, 99 Carolina Street, 13 Buffalo River, 664 Fillmore Avenue, and the Bailey and Kensington corner — and holds no dispatch record at any of them, so no scanner history is reported in this brief.